最好看的MV中文字幕国语电影,最好看免费观看高清电影大全,最好看的2019中文大全在线观看,2025最好看纤纤电影网,最好免费观看高清在线,最好看免费中文

JINGGONG TECHNOLOGY

TECHNOLOGY

>

專有技術

Bending and Twisting Technology

發布時間:2018-06-08

閱讀:5505


The technology is mainly applied to complex variable and exposed structure of large projects, a solution to the fabrication of space box type structural elements under flexure and torsion. The development of this technology is a revolutionary reform against the traditional roasting and top-pressing fabrication processes, has remarkably increased the fabrication precision and efficiency.

2008 Beijing Olympic main stadium – Bird’s Nest, its structure is very complex. Nearly 30 technical problems need to be solved to hold up this behemoth of 48000 tons. How to design, produce and install over 3000 large bending and twisting steel members is a big challenge. JINGGONG conquered it with the technology of digital controlled machine for bending and twisting steel plates. From then on, the technology has been applied for Shenzhen Bay Sports Center, Dongying Snow Lotus Theater, Arches in King Fahad Financial Plaza, Makkah High Speed Railway Station, etc.


國家體育場(鳥巢).jpg

National Stadium - Bird's Nest, Beijing, China


1516166736926793.jpg

Shenzhen Bay Sports Center, China


timg.jpg

Dongying Snow Lotus Theater, Shandong, China


6-沙特麥加火車站效果圖.jpg

Makkah High Speed Railway Station, Saudi Arabia


欢迎光临: 太原市| 琼结县| 尼玛县| 靖边县| 南平市| 龙泉市| 白河县| 若尔盖县| 左权县| 许昌市| 榕江县| 玉树县| 太白县| 镇安县| 金川县| 古蔺县| 栾川县| 麦盖提县| 罗甸县| 阿拉善盟| 琼结县| 黄冈市| 什邡市| 建瓯市| 津南区| 镇沅| 菏泽市| 普安县| 景泰县| 吉木乃县| 昌邑市| 洛扎县| 澄江县| 洪江市| 泸西县| 宁河县| 辰溪县| 航空| 慈利县| 长宁县| 津市市|